Sample questions
During a lead-safe interior renovation, who must carry out the cleaning verification after the work is finished?
The certified renovator
Any trained worker on the crew
The property owner
A laboratory hired by the firm
Show the answer
A. The certified renovator
The certified renovator personally does the visual check and wipe-card verification. A trained worker may help clean but cannot do the verification, and a lab is only needed if a contract or law calls for dust clearance testing.
Reference: 40 CFR Part 745 Subpart E (EPA Renovation, Repair and Painting Rule, current as amended), 745.85(b) and 745.90(b)
A crew will replace one painted window in a 1962 house. Only a small area of paint will be disturbed. Do the lead-safe renovation rules apply?
No, because one window disturbs less than 6 square feet of painted surface
No, because vinyl replacement windows are exempt
Yes, because window replacement is never eligible for the minor repair exclusion
Yes, but only if a child under six years old lives in the home
Show the answer
C. Yes, because window replacement is never eligible for the minor repair exclusion
The minor repair exclusion does not cover window replacement, whatever the size. The small-area idea is the tempting wrong answer, and the rule does not depend on who lives in the home.
Reference: 40 CFR Part 745 Subpart E (EPA Renovation, Repair and Painting Rule, current as amended), 745.83 (minor repair and maintenance activities)
In construction work, fall protection is generally required where a worker is exposed to a fall of at least how many feet at an unprotected edge?
4 feet
10 feet
6 feet
15 feet
Show the answer
C. 6 feet
OSHA's construction standard sets the trigger at 6 feet. The 4-foot figure belongs to general industry, and 10 feet is the scaffold trigger.