TradeExamPro

Australian Builder Licence and Registration Practice Test

Practice questions on Australian builder licensing and regulation, domestic building contracts, security of payment, insurance and warranty, building approvals and construction management. Each question names the state.

210 questions · 6 topics · start free, no sign-up

Start practising

Mixed practice test

10 questions, graded as you go, with the reason for every answer. Start free, no sign-up.

Timed mock exam

50 questions in 60 minutes, drawn from every topic. No answers shown until the end, then a score, your weakest topics and a review of what you missed.

Practise by topic

Sample questions

In Victoria, a builder's direct cost is $80,000 and the builder adds a 15% markup on cost. What is the price before GST, in dollars?

Answer in $.

Show the answer

92000 $

Markup = 0.15 x 80,000 = 12,000. Price = 80,000 + 12,000 = 92,000.

Reference: Standard construction estimating arithmetic

Victoria: a major domestic building contract has a price of $412,000. What is the maximum deposit the builder may require, in dollars?

Answer in dollars.

Show the answer

20600 dollars

Contract is over $20,000, so the cap is 5%. 412,000 x 0.05 = 20,600.

Reference: Domestic Building Contracts Act 1995 (Vic), deposit provisions

A Victorian builder wants to start work and asks the owner for a deposit before the policy is issued. What does the Building Act require?

  1. The builder may take any deposit if it is under 10 percent
  2. The builder must not demand or take payment until the insurance certificate is issued
  3. The owner must buy the insurance before paying a deposit
  4. The builder may take a deposit if insurance is arranged within 28 days
Show the answer

B. The builder must not demand or take payment until the insurance certificate is issued

For covered work, the builder must not require or receive payment until the policy is in place. The deposit limit in the contracts Act is a separate rule and does not replace the insurance duty.

Reference: Building Act 1993 (Vic), domestic building insurance provisions (s 135 and following)

In Queensland, a handyman has already agreed non-licensed work totalling $2,450 for one client. Work up to and including $3,300 needs no licence. How many more dollars of work can be added to this job before a licence is needed?

Answer in dollars.

Show the answer

850 dollars

3,300 - 2,450 = 850. Any value above that pushes the job over the $3,300 limit.

Reference: QBCC guidance: when you need a licence (QBCC Act 1991 Sch 1A; QBCC Regulation 2018 Sch 1)

For a new Class 1a house on a concrete slab in Queensland, which set of mandatory inspection stages normally applies?

  1. Footing, frame and handover only
  2. Footing, slab, frame and final
  3. Excavation, plumbing, roof and handover
  4. Slab and final only
Show the answer

B. Footing, slab, frame and final

For houses and sheds on a slab, the Queensland stages are footing, slab, frame and final. The shortened lists leave out stages where the work becomes hidden, which is why those stages exist.

Reference: Building Act 1975 (Qld), inspection stages for Class 1 and 10 buildings (Building Regulation)