TradeExamPro

Au construction management practice questions

35 questions from the Australian builder licence (VIC, QLD) practice test.

Start practising

Au construction management practice test

10 questions, graded as you go, with the reason for every answer. Start free, no sign-up.

Sample questions

In Victoria, a builder's direct cost is $80,000 and the builder adds a 15% markup on cost. What is the price before GST, in dollars?

Answer in $.

Show the answer

92000 $

Markup = 0.15 x 80,000 = 12,000. Price = 80,000 + 12,000 = 92,000.

Reference: Standard construction estimating arithmetic

In Queensland, after a notifiable incident, what must the person in control of the site do about the scene?

  1. Preserve scene until inspector arrives or directs
  2. Clean up straight away to avoid further risk, removing any evidence of the cause
  3. Move all plant and equipment involved to a depot so it can be examined later
  4. Photograph the site and then resume work
Show the answer

A. Preserve scene until inspector arrives or directs

The site must be preserved, with limited exceptions such as helping a person or making the site safe. Cleaning up or resuming work destroys evidence.

Reference: Work Health and Safety Act 2011 (Qld), s 39

In Queensland, from what project cost level must a principal contractor prepare a WHS management plan for a construction project?

  1. $50,000 or more
  2. $250,000 or more
  3. $100,000 or more
  4. $1,000,000 or more
Show the answer

B. $250,000 or more

The plan is required where the construction work costs $250,000 or more. The other figures are not the threshold.

Reference: Work Health and Safety Regulation 2011 (Qld), Ch 6 (construction work, WHS management plan)

Other topics