California CSLB Law and Business and General Building (B) Practice Test
Practice questions on California contractor licensing law, contracts, liens, insurance, labor and safety rules, plus general building construction knowledge. Written from public California statutes and regulations, not from real exam items.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor and the seller of record, adds tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@tradeexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the mock exam to use it.
Why should fiberglass batt insulation not be stuffed into a cavity that is too small for it?
It makes the wall weaker
Compressing it lowers its insulating value
It increases the vapor passing through the wall
It makes the batt burn faster
Show the answer
B. Compressing it lowers its insulating value
Batts insulate by trapping still air. When they are crushed the air space shrinks and the R-value drops below the label. Compression has no structural effect.
Reference: General building construction practice (edition-independent)
Why should freshly placed concrete be kept moist and not too cold during its first days?
Concrete dries into strength like paint, and moisture only slows it
A chemical reaction that needs water and warmth to continue
Moisture keeps the reinforcing steel from rusting through the slab
Cold weather makes the cement harden faster so it then cracks
Show the answer
B. A chemical reaction that needs water and warmth to continue
Cement gains strength by hydration, which needs water and reasonable temperature. Letting the surface dry out quickly stops the reaction and leaves a weak, cracked surface.
Reference: General construction practice (edition-independent): concrete curing
A contractor signs a home improvement contract for $6,500. What is the most the contractor may ask for as a down payment?
$1,000
$1,300
$650
$325
Show the answer
C. $650
The down payment is limited to the lesser of 10 percent of the contract price or $1,000. Ten percent of $6,500 is $650, which is less than $1,000. The $1,000 figure applies only when 10 percent would be more than $1,000.
Reference: California B&P Code 7159 and 7159.5; CSLB Law and Reference Book (2026 edition)
Which project falls under the Class A general engineering classification?
Remodeling a kitchen
Framing a two-story house
Replacing a home water heater
Building a flood-control channel
Show the answer
D. Building a flood-control channel
Class A covers fixed works that call for specialized engineering knowledge, such as flood control, drainage, bridges and highways. Framing a house or remodeling is building work, and a water heater is plumbing.
Reference: B&P Code §7056; CSLB 2026 California Contractors License Law and Reference Book
A subcontractor first delivers materials to a private job on June 1 but serves its preliminary notice on June 30. Work from which date forward is protected by the notice?
From June 1, the first delivery
Only work after June 30
None; late notice voids all rights
From June 10, twenty days before the notice
Show the answer
D. From June 10, twenty days before the notice
A late notice still protects work furnished beginning 20 days before the notice was given. June 30 minus 20 days is June 10. It does not reach back to June 1, and it does not wipe out every right.
Reference: California Civil Code 8200-8216 (preliminary notice)