Uk site management welfare emergency practice questions

34 questions from the UK site safety (SMSTS, SSSTS, NEBOSH) practice test.

Start practising

Uk site management welfare emergency practice test

10 questions, graded as you go, with the reason for every answer. Start free, no sign-up.

Sample questions

From when must the principal contractor make sure welfare facilities are available?

  1. Once the site has more than ten workers
  2. After the groundworks are complete
  3. Only when the project lasts longer than 30 days
  4. From the start of the construction phase
Show the answer

D. From the start of the construction phase

Welfare facilities must be in place from the start and kept suitable for the whole construction phase. There is no workforce-size or duration threshold that delays them.

Reference: CDM 2015 (SI 2015/51) regulation 13(4) and Schedule 2

A school playground borders your site and children could climb over the hoarding. What duty applies to the principal contractor?

  1. Take reasonable steps to stop unauthorised entry
  2. Post a security guard on duty at the gate all hours of the day
  3. Remove the hoarding on that side so the area can be watched
  4. Warn the school once at the start of the job and keep a record
Show the answer

A. Take reasonable steps to stop unauthorised entry

The principal contractor must take reasonable steps to prevent unauthorised access, such as suitable perimeter fencing, signs and locked gates. A guard is one possible measure but the duty does not specify one, and a one-off warning does not keep children out.

Reference: CDM 2015 (SI 2015/51) regulation 13(4)

A permit to work has been used for a task and the job is finished. What is the correct next step?

  1. The permit is left in the cabin until its printed expiry time
  2. The worker signs it and it remains valid for reuse on later jobs
  3. The area is checked and the issuer cancels the permit
  4. The permit is handed to the next gang so they can carry on
Show the answer

C. The area is checked and the issuer cancels the permit

A permit is closed when the work is done: the area is handed back, checked safe and the permit cancelled. Leaving it valid risks someone using old conditions that no longer apply.

Reference: HSE HSG250 Guidance on permit-to-work systems