10 questions, graded as you go, with the reason for every answer. Start free, no sign-up.
Sample questions
A contractor is told the elevator code is 'ASME A17.1' but the state may be on an older edition. Who decides which edition applies to a job in that state?
The maker of the equipment installed
The authority having jurisdiction that adopted the code
The insurer of the building owner
ASME, which enforces its codes directly
Show the answer
B. The authority having jurisdiction that adopted the code
ASME writes the code, but it has no enforcement power. The state or local authority adopts a specific edition by law or rule. Manufacturers and insurers can add requirements but cannot change the legal edition.
Reference: ASME A17.1-2025/CSA B44:25, foreword; adopting jurisdiction's elevator rules
A crew works in a state that adopted an older A17.1 edition than the newest one published. For code compliance on a new installation, what should they follow?
Whichever edition is newest
Whichever edition costs less to build to
The edition the state has adopted
The edition printed on the equipment nameplate
Show the answer
C. The edition the state has adopted
The legally enforceable edition is the one adopted by the jurisdiction. Newer editions are not binding until adopted, and the nameplate does not set legal requirements.
Reference: ASME A17.1-2025/CSA B44:25, foreword; adopting jurisdiction's elevator rules
Before starting a new elevator installation, a contractor typically needs which of the following from the local authority?
A letter from the equipment maker
A tax clearance for the building site
A permit issued only after final inspection
A permit before work starts
Show the answer
D. A permit before work starts
Most jurisdictions require a permit before installation, alteration or major repair begins, plus an acceptance inspection afterward. Getting the permit after inspection is backwards and is the usual wrong guess.