Excavation, Demolition and Heavy Civil Contractor Practice Test
Practice questions on excavation and trenching, utilities, roadway and bridge work, heavy equipment and cranes, demolition and earthwork quantities, built on public OSHA and federal highway rules.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor and the seller of record, adds tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@tradeexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the mock exam to use it.
A debris chute is steeper than 45 degrees from the horizontal. What does the standard require of it?
It may stay open on one side
It must be fully enclosed
It needs a handrail only
It must be painted yellow
Show the answer
B. It must be fully enclosed
Chutes steeper than 45 degrees must be fully enclosed so falling material cannot escape. A handrail does not contain debris.
Reference: 29 CFR 1926.852(b) (eCFR, current as of November 2026)
A trench is 200 ft long, 4 ft wide and 6 ft deep with vertical sides. How many bank cubic yards must be excavated? Round to one decimal place.
Answer in BCY.
Show the answer
177.8 BCY
Volume = 200 x 4 x 6 = 4,800 cubic feet. Divide by 27: 4,800 / 27 = 177.8 BCY.
Reference: Earthwork estimating practice: bank, loose and compacted volume conversions
A trench is 4 feet 8 inches deep, and the crew plans no protective system. What must be true for that to be allowed?
A competent person finds no cave-in potential
The trench will be open for less than one working day
Everyone inside wears a hard hat and a fall harness
The soil passed a lab test within the past year
Show the answer
A. A competent person finds no cave-in potential
Under 5 feet deep a protective system can be skipped only when a competent person examines the ground and finds no indication of a possible cave-in. Time open, PPE and old test results do not replace that examination. The 4-foot depth still triggers the need for a way out.
Reference: 29 CFR 1926.652(a)(1)(ii)
A crane boom touches an energized power line, but the operator is unhurt and there is no fire. What should the operator do first?
Climb down quickly so the crane can be moved away from the line
Stay in the cab, warn others to stay away, and wait until the utility says the line is dead
Step onto the ground holding the crane's handrail to stay steady
Ask the oiler to pull the boom free using a rope
Show the answer
B. Stay in the cab, warn others to stay away, and wait until the utility says the line is dead
Staying in the cab keeps the operator at one potential, and ground around the machine can be energized. Leaving is only for imminent danger such as fire. Touching the machine and the ground at once can be fatal.
Reference: 29 CFR 1926 Subpart CC (eCFR, current), 1926.1408 (training on contact with a line)
On a granular base, what is the purpose of a prime coat applied before asphalt paving?
It soaks into the base top and helps the asphalt stick
It increases the base depth by about one inch
It cools the base so the new asphalt does not overheat
It replaces the need to compact the base
Show the answer
A. It soaks into the base top and helps the asphalt stick
A prime coat is a low-viscosity liquid asphalt that soaks into the base surface, helps hold fines together and gives the pavement a better connection. It does not add depth, cool the base or replace compaction.
Reference: Highway construction practice: asphalt paving