On a granular base, what is the purpose of a prime coat applied before asphalt paving?

  1. It soaks into the base top and helps the asphalt stick
  2. It increases the base depth by about one inch
  3. It cools the base so the new asphalt does not overheat
  4. It replaces the need to compact the base
Show the answer

A. It soaks into the base top and helps the asphalt stick

A prime coat is a low-viscosity liquid asphalt that soaks into the base surface, helps hold fines together and gives the pavement a better connection. It does not add depth, cool the base or replace compaction.

Reference: Highway construction practice: asphalt paving

What is the role of a bridge abutment?

  1. It supports the middle of a long bridge between spans
  2. It carries traffic on top of the deck
  3. It connects the girders to the deck slab
  4. It holds up a span end and retains the approach fill
Show the answer

D. It holds up a span end and retains the approach fill

Abutments sit at the ends of the bridge and hold up the end of the span while retaining the embankment behind them. Piers support the middle, the deck carries traffic, and shear connectors tie girders to the deck.

Reference: Bridge construction: substructure components

What do bridge bearings do?

  1. Hold the deck rigidly so it cannot move at all
  2. Pass girder loads to the piers while allowing movement
  3. Collect water from the deck and carry it to the piers
  4. Reinforce the concrete in the deck slab itself
Show the answer

B. Pass girder loads to the piers while allowing movement

Bearings carry the girder reactions into the piers and abutments yet allow thermal expansion and rotation so stress does not build up. A rigid connection would crack the structure when temperature changes, and drainage and rebar are different parts.

Reference: Bridge construction: bearings and joints